Overview
In brief
For materials, quality starts with the specification. We match each order to material and dimensional standards, require EN 10204 3.1 / 3.2 certification and arrange third-party inspection, PMI, hydrotesting and NDT where specified.
For works, quality is controlled by inspection and test plans, certified inspectors and complete records, from surface preparation to SSPC / ISO 8501 through to final handover documentation.
Inspection is planned before production, not after delivery. An inspection and test plan (ITP) agreed with the client sets the hold and witness points, the tests required and the documents for each item. An EN 10204 3.1 certificate is issued by the manufacturer's inspection department, independent of production; a 3.2 certificate is also validated by the purchaser's authorised inspector or a third-party inspector, which is why 3.2 is specified for critical service.

Technical data
Scope and standards
Executed to client and international specifications, with documented quality checks.
| Material standards | ASTM / ASME, API 5L, API 6D, ISO, EN |
|---|---|
| Dimensional standards | ASME B36.10, B36.19, B16.5, B16.9, B16.47 |
| Certification | EN 10204 3.1 / 3.2 mill test certificates |
| Third-party inspection | SGS, Bureau Veritas, TÜV |
| Testing | PMI, hydrotesting, NDT |
| Coating | Surface preparation to SSPC / ISO 8501; NACE / AMPP inspectors |
| Electrical | IEC, BS, UL and NEMA standards for cables, conduits and containment |
| Before production | Review of the purchase order, specification and ITP; approval of the manufacturer's procedures. |
|---|---|
| During production | Witness or review points for material, welding and NDT as specified. |
| Final inspection | Visual and dimensional checks, marking, and PMI, hydrotest or other tests as specified. |
| Documents | EN 10204 3.1 or 3.2 certificates, inspection and test reports, release note. |
| At site | Receiving inspection and quarantine of non-conforming items. |
FAQ
Common questions
Quick answers about Quality & Inspection Standards. Need more detail? Our team in Yanbu replies within one working day.
Request a quoteWho inspects procured materials?
Third-party agencies such as SGS, Bureau Veritas and TÜV, or the agency nominated by the client.
Do you provide a document pack?
Yes. Certificates, inspection reports and packing lists are compiled for material approval.
What is the difference between EN 10204 3.1 and 3.2?
A 3.1 certificate is issued by the manufacturer's inspection department, independent of production. A 3.2 certificate is also validated by the purchaser's authorised inspector or a third-party inspector and is used for critical service.
What is an ITP?
An inspection and test plan lists each inspection and test, the acceptance standard, and the hold or witness points where the client or a third-party inspector attends.
Quality & HSE
Related pages
Ready to start your project?
Tell us the scope, the timeline and the site. Our team in Yanbu will reply with a tailored proposal within one working day.